The Project of Researching on the Land Requirement for Construction of Waste Recycling,Clearance or

Absrtact
The purpose of the project plan for the Research and Analysis waste recycling, cleared the status of processing facilities set up land supply and demand issues, and set up counseling industry to successfully solve the land issue legal setting. By the Research and Analysis about the current sludge waste storage class 640,000 tonnes For treatment to sludge storage capacity of the existing treatment capacity is still insufficient to about 282,524 metric tons / year. Processing facility site assessment required by an average of about 47,963 square meters, or treatment to cure the most land area of 105,265 square meters. Most use of industrial land at the current calculation, idle land currently the industrial zone has not yet been developed rental of a total of about 670 hectares, of which about 0.72 percent to 1.57 percent - the idle land area required to solve the current sludge waste treatment facility land issues. Waste treatment facility is currently limited to the set of non-urban land use control regulations and industrial parks of various land use and the use of standardized methods, provisions allowing the use of waste treatment facilities restrict industrial areas of land, but to unreasonable conditions which settled in the industrial zone , it is proposed to amend the relevant laws and regulations, this project pursuant to the relevant laws and regulations of the research mentioned proposal to amend the law; the other with policy analysis about domestic waste oil storage site land clearing mechanism set case analysis about the legalization of relevant facilities to assist the implementation of counseling and follow-up case handle recommendation or analysis about setting organization Friends of the company handling the land issue counseling advice. In addition codification "waste disposal facilities for reviewing land-use reference guide" to provide relevant industry competent authority to review the application and reference has been completed. Currently the type of waste material need not apply to the final disposal of the fuel include general industrial waste, waste incineration plant slag and fly ash cured bottom, the reuse of waste residue after construction, general industrial waste after recycling derivatives, Taipower fired power plant fly ash and bottom ash, stone, steel converter (building temporarily into the remaining soils), and its total annual demand of 225-381 million m3, then bury the remaining about 420 (ten thousand m3), is clearly insufficient. Future planning should accelerate the completion of a landfill setting, or a positive assessment to the reclamation of part of the way to the general discomfort burning industrial waste, in order to avoid any waste disposal pollution. Ministry of Economic Affairs is currently planning for the industrial area of waste recycling, clearance and public facilities count area EIA conclusion Question 19 hectares of processing facilities use, if in order to change the way variance analysis or for use as other waste treatment facilities and landfill accelerate Lungchi settings, such as to accelerate the setting and as soon as possible to enable the operation, and opened up the area for an industrial waste disposal of the final approach, the current situation can be improved when the issue. Also with the Ministry of the Interior planning national regional planning policy, this project research assistance mention waste recycling cleaning process proposed amendment specification of related industries, provide counseling settings feasibility analysis about coaching set of integrated waste treatment center assessment report and industry International staff work.
Keyword
Waste, Recycling , Clearance, Treatment,land, Construction, Counselling, National Regional Planning, Industrial Development
Open
top